Emma Davis, 4OVER4 print production voice (illustration)
Emma Davis Print Production Specialist at 4OVER4.COM

Emma is our prepress and print production voice, built from the knowledge of our production team, with over 20 years in printing.

Question

What is the lead time for lenticular prints?

Answer

3D lenticular products take longer to produce than standard print products because of the layered animation and precision finishing involved. As a general guide, plan for 22 business days from order confirmation and proof approval, or 15 with the faster turnaround most lenticular products offer at checkout, not counting shipping transit time. The current estimate is shown on each specific lenticular product page.

  • Check the page: the turnaround on the exact lenticular product you want is the reliable figure.
  • When the clock starts: production time begins after order confirmation and proof approval, so submitting print-ready files quickly keeps you on schedule.
  • Why it takes longer: interlacing the frames, aligning them to the lens, and curing the bond all add production time you will not see on ordinary cards or postcards.
  • Bigger jobs: larger formats and multi-image animation effects can push toward the upper end of the range.
  • Expedited options: the sales team can discuss faster availability where possible.
  • Plan ahead: add your shipping method's transit days on top of the production window, and allow extra buffer for event-driven deadlines.

Ready to order?

Get your postcards printed at 4OVER4

Order postcards →
Flip Through Our Catalogs Free online flipbooks of our print collection. No account and nothing to download. Open the Catalogs →
FSC Certified Printer #C013635
G7 Certified Color Accuracy
25+ Years Since 1999
150,000+ Businesses Served